Skip to main content

Followers

Implementation and Software Maintenance in System Analysis and Design

 Implementing a new system is an important aspect of system development life cycle.


Implementation is the process of system development life cycle where the users bring the developed system in working condition, it means the developed system starts its work and after this it is handed over to the user.


Conversion is that process of completing all works which as a result hands the new system over to the user.


There is a little difference between implementation and conversion. Converting the


developed system completely into working condition is called implementation. While conversion is an activity of implementation. Implementation includes several activities besides conversion which contain appraisal after implementation and software main-tenance.


Conversion stands for replacing one system with another. Its objects are-activating the tested system and minimizing the conversion cost, risks and the annoyance of the user


The main tasks in the process of conversion are to create files in accordance with the computer, to train the operating staff and to install hardware and terminal.


An important aspect of conversion is that it should not turn an obstacle in the functions of the organisation.


Conversion is the most important and interesting phase of System Development Life Cycle for here is to come out the result of the actions of the designer group.


Usually, the system contains many forms and procedures of the old system, and modification is required to mould it as per the new system.


The new computer system may include some programs of the conversion problems takes place when new equipments are insalled, the input and output of the old pro-gram change or the already created programs are not fit for the new enviornment.


The program might have to be created again, if they are not effective enough.


File conversion is the most time taking and expensive phase in the whole project. The importance of this task is often undervalued.


In the analysis of user training, chiefly two factors are stressed, the ability of the user and the nature of the system being installed. The user may be from naive to conscientious. The developmental research presents extremely interesting facts that what inexperienced users think about their first exposure to the new system. They take it as concrete learners.


Generally, no change within the company is happily accepted by the staff. Specially, when the change is going to influence the whole system, it is natural that it will be resisted.


Post implementation review is a process in which it is determined to which extent the system is functioning well and is capable of fulfilling the requirements of the users.


Software maintenance is the name of the service after sale. As, we purchage any product like refridgerator, computer etc.


Maintenance is neither interesting like system development nor is it more rewarding. It is a work of such class which demands neither skill nor experience.


Maintenance is classified in three ways- corrective, adaptive and perfective. Maitenance stands for improvement in process or function failure. Such sort of maintenance also refers to such changes which had to be made because of some wrong anticipations.


A serious problem with software maintenance is that the nature of its work is labour intensive. It is an error-prone process which is supposed to be a work more costly than writing the program.


Maintenance management audit which evaluates the quality of maintenance effort through interviews and questionnaire.


An integrated approach on determining system documentation and data files and database and system maintainability, reliabilty and efficiency


Such maintenance reduction plans result in more reliable software, less maintenance back-log, time saving in error rectification, enhanced satisfaction of the user and job satisfaction of the maintenance staff.

Comments

Popular posts from this blog

चिल्ड्रन डे की ढ़ेरों बधाईयां

  मेरे प्यारे नन्हें बच्चों!   पहले, मैं सभी बच्चों को इस दिन की बहुत-बहुत शुभकामनाएँ देना चाहता हूँ। आप सभी इस दुनिया का सबसे अनमोल हिस्सा हैं। आपके शिक्षक उम्र और तजुर्बे में आपसे काफी बड़े है, बढ़ती उम्र उनके माथे में अनायास सिकन लाती है l दुनियाभर की बेमतलब जिम्मेदारियों के बोझ में शिक्षक को सुकून तब मिलता है जब आपका मुस्कुराता हुआ चेहरा सामने आता है l आपको शायद अभी इसका अहसास न हो, लेकिन इस बात में कोई दो राय नहीं है कि आप सभी उस ईश्वर/भगवान या उस अलौकिक परमतत्व के प्रतिरूप है l  चिल्ड्रन डे, जो कि हमारे प्रिय पंडित जवाहरलाल नेहरू के जन्मदिन पर मनाया जाता है, हमें यह याद दिलाता है कि बच्चों का भविष्य हमारे समाज का भविष्य है। नेहरू जी ने हमेशा बच्चों के विकास और शिक्षा को प्राथमिकता दी। उन्होंने कहा था कि "बच्चे हमारे भविष्य हैं," और यही कारण है कि हमें उन्हें प्यार, देखभाल और सही दिशा में मार्गदर्शन देना चाहिए। आज का दिन सिर्फ उत्सव मनाने के लिए नहीं हैं, बल्कि हमें यह भी सोचना है कि हम बच्चों को कैसे एक सुरक्षित, खुशहाल और समृद्ध जीवन दे सकते हैं। हमें बच्चों क...

भारत का सर्वोच्च न्यायालय

  संगठन चार्ट प्रधान सचिव रजिस्ट्रार (न्यायिक सूचीकरण) अतिरिक्त रजिस्ट्रार उप रजिस्ट्रार सहायक रजिस्ट्रार / एआर-सह-पीएस शाखा अधिकारी/कोर्ट मास्टर व्यवहार करने वाले अधिकारी रजिस्ट्रार (न्यायिक प्रशासन) अतिरिक्त रजिस्ट्रार उप रजिस्ट्रार सहायक रजिस्ट्रार शाखा अधिकारी व्यवहार करने वाले अधिकारी रजिस्ट्रार (खरीद एवं भंडार) अतिरिक्त रजिस्ट्रार उप रजिस्ट्रार सहायक रजिस्ट्रार शाखा अधिकारी व्यवहार करने वाले अधिकारी रजिस्ट्रार-I (गोपनीय कक्ष) अतिरिक्त रजिस्ट्रार उप रजिस्ट्रार सहायक रजिस्ट्रार शाखा अधिकारी व्यवहार करने वाले अधिकारी रजिस्ट्रार (न्यायाधीश प्रशासन एवं अंतर्राष्ट्रीय संबंध) अतिरिक्त रजिस्ट्रार उप रजिस्ट्रार सहायक रजिस्ट्रार शाखा अधिकारी व्यवहार करने वाले अधिकारी रजिस्ट्रार (प्रौद्योगिकी) अतिरिक्त रजिस्ट्रार उप रजिस्ट्रार सहायक रजिस्ट्रार(कंप्यूटर) शाखा अधिकारी व्यवहार करने वाले अधिकारी/ तकनीक. सहायक-सह-प्रोग्रामर रजिस्ट्रार-II (गोपनीय कक्ष) अतिरिक्त रजिस्ट्रार उप रजिस्ट्रार सहायक रजिस्ट्रार शाखा अधिकारी व्यवहार करने वाले अधिकारी रजिस्ट्रार (न्यायालय एवं भवन) अतिरिक्त रजिस्ट्रार उप...

1. B.Shah vs. Presiding Officer, Labour Court, AIR 1978 SC 12

 Ref : AIR 1978 SC 12 Sub :- This case is based on Section 5 of the Maternity Benefit Act, 1961 Facts of the case:- 1. A woman by the name of Sulbamal worked in an industry named Mount Stuart Estate which was related to planta- tion. 2. Sulbamal gave an application for maternity leave. The estimated period for delivery was 16-12-1967 and she deliv- ered the child on this very date. 3. Maternity benefit was given by way of salary for 72 work- ing days by the employer to the woman workman, but in this period Sunday being the holiday, was excluded by the employer. 4. Thus, being dissatisfied with the amount so provided, she filed an application before the employer in this regard. 5. It was demanded by the woman workman that she should be given full benefit of 12 weeks under the provisions of the Maternity Benefit Act, 1961 which is of full 84 days, not of 72 days because Sunday is also included in it. 6. But, she was denied of the payment of full 84 days by the employer. Trial Court...